Case stories

Case stories

5 August 2020

The Rye by Tikari in London: sustainable living, with a difference

Construction

PEFC-certified cross laminated timber has been used to create sustainable and thermally efficient duplex apartments in South London, with a unique and authentic design.

28 July 2020

Circle K: towards sustainability with PEFC-certified packaging

Packaging

For Circle K, the use of sustainable packaging without reducing food quality is a priority. It’s a requirement that paper-based packaging must be made from certified material.

22 July 2020

Regent's Park Theatre London: timber performs perfectly

Construction

Regent's Park Theatre has used PEFC-certified cross laminated timber (CLT) already in 2012 for a series of sustainable buildings. In 2018, CLT was back, allowing for the construction of a two-storey building within the six-month window between theatre seasons.

10 July 2020

Australian Turtle Centre: timber chosen for strength and sustainability

Construction

Mon Repos is home to the largest concentration of marine turtles on the eastern Australian mainland. The Centre recently underwent a rejuvenation, using certified glued laminated timber.

3 July 2020

Heath Robinson Museum: meeting low energy ambitions with PEFC-certified timber

Construction

The dynamic new Heath Robinson museum in Pinner, UK, uses PEFC-certified CLT to make a place for community arts, activity and exhibitions.

Keep in touch

Subscribe to our newsletter