Case stories
14 January 2014
Kingsgate House: scoring UK sustainability first
Project certification
Kingsgate House, a seven-story residential project in London, was the first major construction project in the world to achieve PEFC Project Certification.
18 October 2013
Winter Universiade welcomes PEFC Project Certification
Project certification
PEFC-certified forests provided the backdrop to the Winter Universiade, which took place in Trentino, Italy in December 2013. The project was the second in Italy to receive PEFC Project Certification.
22 August 2013
Center Parcs - PEFC at the heart of one of the UK’s most sustainable holiday destinations
Construction
Center Parcs, a large scale tourism destination in the UK, chose PEFC-certified, solid timber glulam beams for its new Subtropical Swimming Paradise.
27 July 2012
2012 Olympic Games celebrate world first dual project certification
Project certification
The 2012 Olympic Park in London is the first project to achieve dual Project Certification from PEFC and FSC.
13 March 2012
Ground-Breaking Bridport House Built from PEFC Certified Spruce Wood
Construction
Bridport House is a ground-breaking multi-storey residential complex built from cross-laminated timber (CLT). The construction of the structure took 10 weeks, which is considerably faster than the time required for a structure with a conventional concrete frame.