Case stories
10 July 2020
Australian Turtle Centre: timber chosen for strength and sustainability
Construction
Mon Repos is home to the largest concentration of marine turtles on the eastern Australian mainland. The Centre recently underwent a rejuvenation, using certified glued laminated timber.
3 July 2020
Heath Robinson Museum: meeting low energy ambitions with PEFC-certified timber
Construction
The dynamic new Heath Robinson museum in Pinner, UK, uses PEFC-certified CLT to make a place for community arts, activity and exhibitions.
4 November 2019
Bristol Old Vic Theatre: star role for PEFC-certified timber
Construction
Old Vic Theatre in Bristol, UK, has recently undergone a £9.3 million makeover and has been given a new look with PEFC-certified timber at its heart.
4 October 2019
Tree house: PEFC-certified timber makes visitors want to return to their childhood
Construction
Designed for the Chelsea Flower Show in London, the tree house illustrated the show’s theme of ‘Back to Nature’.
15 July 2019
Mjøstårnet: the world’s highest timber building opens in Norway
Construction
The revolutionary use of PEFC-certified timber in its construction and cladding makes the tower an internationally renowned signal building.